Evercross
Custom Container Industrial Lifting Equipment For Short Distance Movements
Description:
Heavy-Duty Container Roller Movement Set also known as a hydraulic container wheel, is a specialized device that combines hydraulic lifting capabilities with wheels to handle and transport containers. This type of equipment is commonly used in ports, terminals, and other logistics facilities for efficient container handling.
Applications of Container Movement Set:
Port and Terminal Operations
Container Yards and Depots
Intermodal Facilities
Warehousing and Distribution Centers
2. Performance Index
1. The container movement set is used for lifting and moving the heavy-duty container.
2. Hydraulic system can be locked reversely, in order to preventing the shelters or transportation containers from falling down.
3. It can be put in place reliably after loading containers
4. It is suit for 40ft and 20ft standard container.
Hydraulic System: The hydraulic system is responsible for powering the lifting mechanism of the container handling wheel.
Lifting Mechanism: The lifting mechanism of the container handling wheel is designed to securely grip and lift containers.
Wheels: The container handling wheel is equipped with wheels or casters to enable easy and smooth movement.
Compositions
The composition of the equipment is as shown in pic1, pic2
Pic1 Moving wheels
Pic 2 Transportation Platform
Table2 part list of transportation equipment
Serial number | Parts name | Type | Qty | Remark |
1 | Moving wheels | Saem-611-01 | 4 | |
2 | Lifting rod | Saem-611-02 | 1 | |
3 | Hydraulic system | Saem-611-03 | 4 | |
4 | Cross rod for vehicle traction | Saem-611-04 | 1 | |
5 | Drag rod for vehicle traction | Saem-611-05 | 1 | |
6 | Direction arm for vehicle traction | Saem-611-06 | 1 | |
7 | Manual drawbar | Saem-611-07 | 1 | |
8 | Height indicator system | Saem-611-08 | 1 | |
9 | Direction locking mechanism | Saem-611-09 | 1 | |
10 | Bottom locking mechanism | Saem-611-10 | 1 | |
11 | Top locking mechanism | Saem-611-11 | 1 | |
12 | Positioning device | Saem-611-12 | 2 |
Operation method
Check before use
Step1: Check the main part of Container Movement-hydraulic pump, whether the hydraulic oil meets requirements, the resistance of hydraulic rod is right for moving up and down, check whether the hydraulic system is oil leak and loose. The hydraulic system shall be operated after finishing inspection.
Step2: Check the oil valve of hydraulic pump in level ground. The level of oil cannot be lower than the center of sight flow glass, forbidden using with a little oil or without oil.
Step3: Count the components of container movement, the components details see table2
Step4: Open the locking mechanism of two forwarding moving wheels. Move a full set of container movement near to the container, and put it in steady place, lock moving wheels mechanism, insert the king pin, in order to keep steady for further usage.
Installation
Step1: To remove the boss connecting rods from carriage shelves, and put it in a place which will not affect the movement of Heavy-Duty Container Roller Movement Set.
Step2: To remove the manpower drawbar from the carriage shelves, insert it in the corresponding position of main part in the moving wheels, connect with pin and spring pin for manpower moving trolley. As is shown in pic3:
Power Source: Hydraulic lifting container handling wheels typically require a power source to operate the hydraulic system.
The hydraulic lifting container handling wheel provides efficient and flexible container handling capabilities by combining the lifting power of hydraulic systems with the mobility of wheels.
Step3: Remove the hydraulic system from carriage shelves and insert into hydraulic tub, lock the ends and fasten screws, as shown in pic4;
Step4: To move spring pin and pin in the wheel support arm poke and transport shaped frame, to loosen the lock of moving wheel, to make sure the locknut in a released status, to keep the handle in a horizontal status, and then remove the transport mechanism from the carriage shelves.
Step5: To fasten the four sets of cabins in the relative position of Heavy-Duty Container Roller Movement Set, insert the locking mechanism into the holes of the corner fittings for container, turn handle 90 degrees counterclockwise, then tighten the locknut. Insert locking mechanism of moving wheels into right hole of shelters, make the handle in upright status, lock the nuts. As is shown pic5, pic6.
Remark: When it is not smooth when driving mechanism is inserted into the corner, the hydraulic operation levers could be adjusted to change the vertical direction of lock mechanism. Adjust bolt1 if there is left or right deviation for top locking mechanism, bolt2 can be adjusted if there is upside or downside deviation.
Step6: Mount the cross rod for vehicle traction and adjust it to proper length according to the container width. Install the cross rod into the slotted component on the front moving wheels of the container through hinge pin and spring pin.
Step7: Install drag rod for vehicle traction: assemble two sections in place of the cross rod for vehicle traction with hinge and spring pin.
Step8: Install direction arm for vehicle traction: adjust the length of direction arm, one end shall be mounted in shaft pin of moving wheels with hinge, spring pin, another end need to be fixed in shaft pin of drag rod for vehicle traction with nuts, lock the adjust bolt in two ends of direction arm for vehicle traction by monkey wrench.
Notice: Keep the length of two direction arms for vehicle traction equal, otherwise, it will run one side during moving.
Step9: Operators in position: one person on each corner of the container to make sure the container in a horizontal situation. Mark the initial position of the pointer and adjust the reversing valve of the hydraulic system to UP. Everyone acts following the order, working on the hydraulic rod and watching the height display from the pointer. Try best to keep all four corners are lifted with the same speed;
Step10: Link the ring of the drag rod to the hauling hook of the tractor. Open the direction lock mechanism for the two moving wheels. Slow down the moving speed on unevenness surface when moving containers by tractor.
Notice: Keep the minimum turning radius R=7m,and the angle of turn is less than 30°.Both sides of direction arm for vehicle traction shall be connected with drag rod and moving wheels respectively. When the tractor is turning, drag rod is being turned, and transmits the direction to moving wheels through direction arm.
Step11: Fasten the nuts of position device after moving the container to required place, to make sure stop reliably.
Notice: Make sure the slope of ground is not higher than 1% if it is necessary to stop. Screw up the nuts of position device by hand to make brake block the wheels.
Warning:
During long distance movement of vehicle traction(≥500m), keep the distance less than 240mm between the shelters and ground.
Moving speed in straight line should not be higher than 10km/h, turning corner speed should be lower than 5km/h.
Roll-up process
Step1: The vehicle traction rod and the vehicle traction shall be separated after reaching the destination.
Step2: Tightening the locking mechanism, make sure stop reliably.
Step3: Put the commutator valve in hydraulic system in down position, the shelter will be landed smoothly by hydraulic rod.
Step4: Remove the vehicle traction direction rod from the vehicle traction rod, the traction direction rod shall be adjusted to the shortest position, and lay up on the surrounding ground level.
Step5: From the vehicle traction rod pull open the spring pin and the pin shaft, take down the vehicle traction rod, putting the traction rod split into two sections, lay up on the surrounding ground level.
Step6: Pull off the spring pin and the hinge pin to, take off the cross rod for vehicle traction, adjust it to installation status, put it onto level ground.
Step7: Pull of the moving wheels from the corners of shelter after open top and bottom locking mechanism, insert bottom locking mechanism into corners of transportation frame, tighten the locking mechanism.
Step8: Take hydraulic rod off from moving wheels, insert into mounting holes correspondingly from top to bottom.
Step9: Disassemble the joint bolt and nut from manpower traction rod, which shall be taken off and hung in place of corresponding pin shaft of transportation frame.
Step10: Put the direction arm for vehicle traction on the angle pin.
Step11: Tighten the manpower traction rod, direction arm by tie.
Step12: The vehicle traction rail shall be mounted on one side of transportation frame, putting the lower end into the groove shaped piece, in the bottom of transportation frame, the upper end is connected to the corner of transportation frame by a pin shaft and a spring pin.
Step13: Mount the traction rod on another side of transportation frame, the lower end shall be inserted into bottom channel pieces, the upper end shall be tightened by limit.
Step14: Connect the boss connecting rod with the two groove parts of the moving wheel by the pin roll and the spring pin.
Step15: When moving container movement set is completed, the vehicle traction rod is divided into two sections is mounted on the carrier side in case of hoisting, assemble the vehicle traction rod and the pin roll by the spring catch in case of vehicle traction, assemble traction rod and the boss connecting rod pin boss by the spring catch. In case of manpower transportation, take the human traction rod down, and connect it with moving wheels by the spring catch and pin roll.
Warning: (1)Whether manual traction or vehicle traction transport the Heavy-Duty Container Roller Movement Set, you must open two moving wheels lock mechanism in the forward direction.
(2)To ensure the hoisting hydraulic system in fully retracted state, back to the bottom, this moment continue to add pressure, put the hydraulic valve handle is in the lift (UP) position, and then hoisting. Hoisting continuously shall not be more than 10min.
Maintenance
1. Clean the dirt on surface of device in time after using it, keep it dry and tidy. choose neutral cleaning agent is better for cleaning, Prohibit the use of cleaning agent corrosive.
2. The structure, hydraulic circuit shall be checked before and after using, make sure the structure without damage and hydraulic circuit in normal status, If there is existence of hidden dangers, timely replacement or stop using.
3. Replacement of hydraulic oil
- Fuel tank capacity (single one): 2.1 L.
- Requirement of hydraulic oil:15#hydraulic oil
- Replacement method of the hydraulic oil: The cylinder assembly retreats to the limit position and take down from the mobile shelves, unscrew the top valve, pour the hydraulic oil out from the oil tank and then add enough clean backup oil, (note: when you refuel the oil tank, it is required to filter and leave the oil record), put the hydro-cylinder lift and the oil in the tank has been up, injection the selected and clean hydraulic oil (note: in this moment the oil level should be over 3/4 of the tank height according to the liquid level is above the observation window center red circle on the edge), it can be used after the cylinder back to the limit position and in accordance with the order of assembly.
4. Keep Container Movement Set in good status, prevent from rain, sun, water, damage and so on.
5. Fault diagnosis and troubleshooting of the hydraulic system
The common failure usually occurs in the hydraulic system of the Container Movement Set. Therefore, the following describes common fault diagnosis and elimination of hydraulic system.
Hydraulic equipment is composed of mechanic, hydraulic pressure, the failures are in varied forms. One failure could be caused by many factors, analyze the hydraulic trouble shooting shall understand hydraulic principle chart and moving wheels hydraulic system drawing. see pic6. In general, the hydraulic system failure 80% is caused by pollution of hydraulic oil or not working hydraulic components, they will be considered during fault diagnosis.
Fault diagnosis and troubleshooting
Table3 The exclusion of common faults
Fault conditions | Fault phenomenon and reason | Elimination method |
No pressure | Pump could not suck the oil | Fuel tank, Change the filter |
The assembly of pump is not appropriate, the pump is not work, is dirty. | Repair or replace | |
Insufficient pressure | Pump or fluid cylinder is damaged, and Internal leakage. | Replace or repair |
The tank level low | Oil to the labeled Height | |
Cylinder does not work | Fuel tank without oil | Add the hydraulic oil |
The seal of the hand pump is damaged, Oil pressure is not promoted. | Dismantle the manual pump, | |
Replace seals | ||
Cylinder without rod,oil pipe is loosen | Screwed pipe joint | |
The piston rod oil | The seal components for the front of the oil cylinder are wear and tear. | Remove cylinder rod end seal |
Joint leakage | The pipe joint is loose | Tighten the joint |
Sealing washer of the joint is damaged. | Replace sealing washer | |
Matching list
The list of supporting projects is as follows:
Serial number | Parts name | Type | Qty | Remark |
1 | Moving wheels | Saem-611-01 | 4 | |
2 | Lifting rod | Saem-611-02 | 1 | |
3 | Hydraulic system | Saem-611-03 | 4 | |
4 | Cross rod for vehicle traction | Saem-611-04 | 1 | |
5 | Drag rod for vehicle traction | Saem-611-05 | 1 | |
6 | Direction arm for vehicle traction | Saem-611-06 | 1 | |
7 | Manual drawbar | Saem-611-07 | 1 |
Evercross Steel Bridges Overview :
EVERCROSS STEEL BRIDGE SPECIFICATION | |
EVERCROSS STEEL BRIDGE | Bailey bridge (Compact-200, Compact-100, LSB, PB100, China-321, BSB) Modular bridge (GWD, Delta, 450-type, etc.), Truss Bridge, Warren bridge, Arch bridge, Plate bridge, Beam bridge, Box girder bridge, Suspension bridge, Cable-stayed bridge, Floating bridge, etc. |
DESIGN SPANS | 10M TO 300M Single span |
CARRIAGE WAY | SINGLE LANE, DOUBLE LANES, MULTILANE, WALKWAY, ETC |
LOADING CAPACITY | AASHTO HL93.HS15-44, HS20-44, HS25-44, BS5400 HA+20HB, HA+30HB, AS5100 Truck-T44, IRC 70R Class A/B, NATO STANAG MLC80/ MLC110. Truck-60T, Trailer-80/100Ton, etc. |
STEEL GRADE | EN10025 S355JR S355J0/EN10219 S460J0/ EN10113 S460N/BS4360 Grade 55C AS/ NZS3678/ 3679/ 1163/ Grade 350, ASTM A572/A572M GR50/GR65 GB1591 GB355B/C/D/460C, etc. |
CERTIFICATES | ISO9001, ISO14001, ISO45001, EN1090, CIDB, COC, PVOC, SONCAP, etc. |
WELDING | AWS D1.1/AWS D1.5 AS/NZS 1554 or equivalent |
BOLTS | ISO898, AS/NZS1252, BS3692 or equivalent |
GALVANIZATION CODE | ISO1461 AS/NZS 4680 ASTM-A123, BS1706 or equivalent |